In brief
- Look for moisture and rot before you make the plan.
- Decide pipes and power before you order tiles.
- Document the sealed base with photos before the tiles go on.
See what is already there
I open up and look at the floor, the walls and the pipes. Is there moisture or rot? How does the drain sit? What year was the house built? This decides what the job requires, and I want to know it before I give anyone a plan.
Plan pipes and power before tiles
I decide where the drain, shower, sink and sockets go before I order anything. The plumber and the electrician must come in early. If they come late, I often have to break up what is already done.
Seal the base, then comes the beautiful part
Under the tiles sits the layer that keeps water away from the structure. It is the part nobody sees, and the part that matters most. I spend time on it and document it with photos before the tiles go on.
One person holding the threads
A bathroom involves many trades. When one person coordinates the order of work, there are fewer mistakes and less waiting. Feel free to get in touch if you would like an assessment before you start.


