Bathrooms: what I check before I tear out

Moisture, pipes, power and the base layer. Here is what I check myself before tearing out a bathroom, in the order I do it.

Many people planning a bathroom renovation think first of tiles and colours. I think about what is behind them. Here is what I check before I tear anything out.

In brief

  • Look for moisture and rot before you make the plan.
  • Decide pipes and power before you order tiles.
  • Document the sealed base with photos before the tiles go on.

See what is already there

I open up and look at the floor, the walls and the pipes. Is there moisture or rot? How does the drain sit? What year was the house built? This decides what the job requires, and I want to know it before I give anyone a plan.

Plan pipes and power before tiles

I decide where the drain, shower, sink and sockets go before I order anything. The plumber and the electrician must come in early. If they come late, I often have to break up what is already done.

Seal the base, then comes the beautiful part

Under the tiles sits the layer that keeps water away from the structure. It is the part nobody sees, and the part that matters most. I spend time on it and document it with photos before the tiles go on.

One person holding the threads

A bathroom involves many trades. When one person coordinates the order of work, there are fewer mistakes and less waiting. Feel free to get in touch if you would like an assessment before you start.

Share
Get in touch

Have a project in mind?

Tell me what you are planning — renovation, new build or property. You will get a straight answer on whether it is something I can take on.

Get in touch

Updates by email

New articles and project updates. No more than once a month, and you can unsubscribe at any time.

More Reading
Related Articles